3. Right after rig positioning, drive the casing into the ground. Travel metal casing to your least a depth of one m below the ground degree to get lateral loads and actions at site. The steel casing also combat problems as a consequence of groundwater for the duration of piling.Targeted visitors congestion carries on being An important challenge i